Working, Working and Working

I’ve been scarce around these here parts, haven’t I? I am just hoping that some of you are following my studio blog to see what’s been happening in general. I suppose I’ve been so busy working on the project that I have just been remiss in posting any entries on this blog lately, but I am getting through the paintings as fast as I can.

homestead-for-the-clown

This is the most recent piece that’s actually been completed. It’s called Homestead for the Clown and it’s just 9 x 12 inches (mixed media on birch wood). There were be quite a few small pieces in the show since I’m not so keen on working huge these days.

However, there will be a few larger pieces too, but nothing ridiculous. The largest birch panel is a 36 inch square.

As for the abstract landscapes in oil, I am going to do my best to make at least one that is 40 x 60 inches, which I think is pretty big if you ask me, which you didn’t. That’s the largest that will fit into my car though.

The car won’t matter since I will have plenty to cram into a rental truck. I have plenty going into the Project Room, as small as it is, as well as paintings for the walls. All of that won’t fit into my car unless I did a couple of trips to Venice from the East Side, which is also plausible. We’ll see.

Right now I have been working on the fourth and fifth abstract landscapes and it still feels like I have so far to go to get to my goal (which are a minimum of nine paintings) since they are only going to get bigger from here. M theory really is that the bigger they are, the faster they will go; I won’t have to spend so much time with a 000 brush anymore.

This is the last work-in-progress pic I have the the fourth one:

merry372

I reckon I can finish it by the end of the weekend if I’m lucky.

Here’s the other one I’m working on:

desertlander1

This one is on a 20 x 24 inch panel and I can already see that the panels are taking less time than canvases. I don’t know why, but they are. I always do the foliage last by the way. It is the most fun part for me and I like to save the best part for the last part – cuz I’m a little kid like that.

As for my movie, it is coming along very well and I meet with my collaborators once a week to get things moving. Then we both (all) have tons of homework to do in between meetings. So far, I am really happy with the way the film is turning out and I am excited about it being part of the show! I just hope it’s as cool as I think it is.

I finally got my dates for the spring show at Shulamit Gallery, which will be April 2 – May 30, 2015. The only thing is that the following Saturday is the first day of Passover, so I’m still not sure when the reception is going to be.

I don’t know if I mentioned this, but I had to buy a new tent for the Project Room. It’s better. Trust me.

That’s it for now. I’ll try to do more check-ins more frequently if I don’t get too out-of-my-mind busy.

Thanks for reading!

Leave a Reply

Your email address will not be published. Required fields are marked *